Jet Field Notes

Practical LiDAR workflows in the field

Independent publication · No official affiliation

Choose the route before the scanner.

Jet Field Notes examines where and how Artec Jet can fit field capture work—through project conditions, control plans, QA gates, and required deliverables.

Abstract field route atlas showing survey corridors and checkpoints

Field to deliverable

Enter at the decision your team needs to resolve now.

01 Scope

What must the final dataset prove?

Cost planning
As-builts

02 Plan & control

Which checks anchor the work?

Survey control
Field QA

03 Capture

Which route fits access and risk?

Deployment modes
Underground

04 Process & register

How will field runs become one dataset?

Processing
BIM handoff

05 Verify & deliver

What acceptance gate closes the loop?

QA gates
Deliverables

Application fit matrix

Use this as a planning index, then validate every route against the project specification and site risk plan.

DecisionConstructionFacilitiesRoad corridorsMining / underground
EnvironmentChanging workfaceDense interiors and plantLinear public right-of-wayObstructed, low-light access
Deployment routeWalk or backpack loopsWalk, backpack, or robotVehicle or backpack segmentsBackpack, robot, or vehicle
Control questionHow will repeat visits align?Which project coordinates govern?Where will drift be checked?How will closure be verified?
OutputProgress record / as-built supportRegistered cloud / BIM inputCorridor surface / asset recordMapping / volume input
Next guide →Control to as-builtPlant capture planTopographic field planMine mapping plan

Deployment routes

Walk the changing site

Best fit: traversable interiors and workfaces.
Preflight: Where can loops close?
Constraint: access, occlusion, and operator safety.

Plan this route →

Follow a corridor

Best fit: accessible roads and haul routes.
Preflight: Which segments need checks?
Constraint: traffic, speed, and mounting.

Plan this route →

Separate crew from hazard

Best fit: remotely accessible plant or drifts.
Preflight: Can the platform keep its route?
Constraint: communications and payload integration.

Plan this route →

Reach from above

Best fit: inaccessible exterior routes.
Preflight: What flight rules govern?
Constraint: aviation approval and integration.

Plan this route →

Latest field notes

Independent by design

Jet Field Notes is an independent publication and is not affiliated with or endorsed by Artec 3D. Suitability depends on project requirements, site conditions, and validation against an agreed acceptance plan.

Methodology →   Corrections →   Artec Jet coverage disclosure →